Translations:E3/9/en

From Polyphasic Sleep Wiki

The most important scheduling tip is having the core cover the SWS peak, by starting it around 21-22 local solar time. Rotating the schedule further is very difficult, and requires strict circadian management. An ideal E3 schedule would have all of the SWS need covered in the core, along with some amount of REM.